search full text
Showing side of the Gresham Hotel, buildings on Thomas Lane, stacks of bricks and remains of basements of demolished structures and works ‘railway’ tracks.
still image
Showing Portland stone finished to first-floor level, scaffold and steelworks. Features an unattended pram at the site entrance.
Showing the steel frame and external walls (using recycled brick and stone?).
Showing the steel frame and basements under construction.
Showing almost fully enclosed auditorium space from balcony, with steps for seating, towards screen wall.
Savoy Cinema site works: internal view showing balcony and roof steelworks
Showing the first elements of the external Portland stone façade in place.
Includes the steelwork for an internal dome.